The Reactor was set at the Bayway Refinery in New Jersey. The lift was 830 tons at a 269’1 1/4” radius which was 90.5% of Capacity. The Lampson Transi-Lift LTL-2600B was configured with 400’ of main boom, a jiblet, 120’ Stinger and 3,000 tons of Cwt. The lift and set went very smoothly taking approximately 3 hours.
THE PROJECT
PROJECT DETAILS