The Chevron refinery in Richmond, CA required a reactor and regenerator replacement as part of a major refinery upgrade during a 70-day shut down. This was a good project for the Lampson Transi-Lift 2600. The regenerator lift was 950,000 pounds and the reactor lift was 550,000 pounds. The biggest challenge of this project was assembly/disassembly […]